Kitchen and BathLos Angeles (323) 212-3020 Free estimate

Walk-In Showers in Los Angeles

Curbless, low curb or standard: how we build walk-in showers that last.

A walk-in shower is the upgrade most people ask us for: no tub wall to step over, glass instead of a curtain, and a bathroom that feels bigger. Whether you’re replacing an old shower stall, a tub or a cramped corner unit, here’s how we build one that lasts.

Three kinds of walk-in shower

  • Curbless: no step at all. The floor slopes gently to the drain, often a long linear drain. The easiest to walk into and the cleanest look; it takes the most floor work.
  • Low curb: a short lip at the entry. Less floor work, and still easy to step into.
  • Standard curb: the simplest build, often used when replacing an old shower stall in the same spot.

At the consultation we check your floor and drain and tell you which ones fit. Turning a tub into a shower? See the tub-to-shower guide.

What makes a shower last

  • One continuous waterproof layer on the walls and floor, before any tile.
  • Slope to the drain, so water never sits in a corner.
  • A new valve while the walls are open, with the controls where you can reach them without stepping under the water.
  • Solid blocking in the walls for glass, grab bars and a fold-down seat, now or later.
  • An exhaust fan sized for the room and vented outside.

Choices that make it yours

  • Glass: a fixed panel, a hinged door or a sliding door, measured after the tile is done.
  • Bench and niche: a built-in bench and a recessed niche for bottles.
  • Shower head and handheld: a rain head, a handheld on a slide bar, or both.
  • Tile: large tiles or slabs on the walls for fewer grout lines, smaller tiles on the floor for grip.

Cost and timing

Bathroom projects start from $12,000. What moves the price most: moving the drain, curbless floor work, the size of the tile and custom glass. Most bathrooms take 2 to 4 weeks of construction once materials are on site. A shower remodel that changes plumbing needs a permit; we apply and book the inspections. Read the bathroom remodel cost guide and the permits guide, or see everything we build on our bathroom remodeling page.

Send a photo of your shower or tub with the estimate form and we’ll tell you what to expect.

Get a free estimate

Showers we’ve built

Walk-in shower questions

Will water get out of a shower without a door?

Not when it’s planned right. A doorless walk-in needs enough length and the right slope; if your space is short, a fixed panel or a door is the better choice. We’ll tell you at the visit.

Is a curbless shower possible in an older house?

Often, yes. On a raised foundation we can usually recess the shower floor; on a slab we cut it to set the drain lower. We confirm it before you get the proposal.

Can you make the shower safer for older family members?

Yes: a low or no curb, a bench, a handheld shower, slip-resistant floor tile and blocking for grab bars.

Free estimate

Tell us about your project

Four short steps, about a minute. We call within 1 business day to set up your free in-home consultation.

  • No obligation, no sales pressure
  • Photos help us prepare, but are optional
  • Prefer to talk? Call (323) 212-3020

Step 1 of 4

What are you remodeling?
Where and when?
Anything we should know?
Where should we reach you?

We use your details and photos only to reply about this project. See our privacy policy.

CallFree estimate