Remodeling Your Kitchen and Bathroom Together

One design, one schedule, one permit process and one project manager for both rooms.

Why do both at once

  • One design. Cabinets, counters, tile and fixtures chosen together, so the house feels finished, not patched.
  • One schedule. Plumbers, electricians and tile setters come once for both rooms instead of twice, months apart.
  • One permit process. Both rooms usually go on the same permit and share inspection visits, which saves on permit fees.
  • One disruption. Dust, noise and crews in the house once, not twice.

How we plan it so you can still live at home

The order matters. When the house has another working bathroom, we usually start both rooms together. When the bathroom we’re remodeling is the only one, we plan around it: we provide an on-site portable restroom and finish the bathroom work first so it’s back in use as early as possible. For the kitchen, we help you set up a simple temporary kitchen with the fridge and a microwave in another room.

Doing both usually costs less

In most cases, combining the kitchen and bathroom into one project costs less than doing them separately. Demolition, protection, dumpster, plumbing and electrical visits, the permit and inspections are paid once instead of twice, and materials for both rooms can be ordered together.

What it costs

Each room is priced on its own line, so you can see both clearly: bathrooms start from $12,000 and kitchens from $15,000. Shared work like the permit, protection and trade visits is planned once. The kitchen remodel cost guide and the bathroom remodel cost guide explain what moves the price.

How long it takes

Most bathrooms take 2 to 4 weeks of construction and most kitchens 3 to 6 weeks once materials are on site. Done together, the total is usually shorter than doing them one after the other, because the trades overlap. The remodel timeline shows what happens each week. See everything we build on our kitchen remodeling and bathroom remodeling pages.

Pick “Both” on the estimate form and we’ll plan the two rooms together from the first visit.

Get a free estimate

Kitchens and bathrooms we’ve done together

Questions about doing both

Can I do the kitchen now and the bathroom later?

Yes. If you plan both now, we design them together and build in two phases, so the second room still matches the first.

Do I need two permits?

Usually one permit covers both rooms when they’re done together, but your city decides. The permits guide explains who issues yours. We apply and book every inspection.

Will I have one point of contact?

Yes. One project manager runs both rooms from the first visit to the final walkthrough.

Free estimate

Tell us about your project

Four short steps, about a minute. We call within 1 business day to set up your free in-home consultation.

  • No obligation, no sales pressure
  • Photos help us prepare, but are optional
  • Prefer to talk? Call (323) 212-3020

Step 1 of 4

What are you remodeling?
Where and when?
Anything we should know?
Where should we reach you?

We use your details and photos only to reply about this project. See our privacy policy.

CallFree estimate