Kitchen and Bath Los Angeles contractors in Los Angeles, Studio City, Pacific Palisades, & Altadena, California, have streamlined the remodeling process, offering clients a clear breakdown of each stage along with an estimated timeline.
Transforming a bathroom is a layered process that begins long before any tile is laid. It starts with analyzing the space for potential examining plumbing access, natural light, and structural constraints. After designs are finalized and approvals secured, the room is stripped back to its bare bones. Pipes, wiring, and ventilation are mapped out anew, accommodating updated layouts or modern features like wall-mounted vanities or rainfall showers.
The bones of the room are then rebuilt, walls are reinforced or adjusted, and subfloors inspected or replaced. Instead of rushing to finish, attention turns to protection: moisture barriers and waterproofing systems are meticulously applied to prevent future damage. With the foundation set, surfaces take shape. Tiling is both a craft and a science, requiring precision and patience.
Finally, the room comes to life as fixtures, mirrors, lighting, and hardware are installed. The result is not just a bathroom, but a space reimagined, from the inside out.
Shortly, here are the main stages:
Planning, demolition, rough-in phase, plumbing adjustments, electrical rewiring, HVAC updates, framing adjustments, Moisture-resistant drywall or cement board, waterproofing membranes, Tile installation, toilet, vanity, shower trim, and lighting, mirror installation, painting, sealing grout, and a thorough clean-up. A final walkthrough ensures quality, code compliance, and client satisfaction before the project is officially completed.
The bathroom remodeling industry in Los Angeles thrives on a mix of innovation, cultural diversity, and high expectations. With the city’s blend of historic homes and cutting edge architecture, contractors often balance preserving character with integrating modern luxury. Homeowners in LA seek spa-like bathrooms, high efficiency fixtures, and smart technology from steam showers to touchless faucets. Earthquake codes, water restrictions, and tight permitting guidelines add complexity, making experienced professionals essential. Design trends lean toward clean lines, natural materials, and light enhancing layouts to match the city’s indoor outdoor lifestyle. Space optimization is key in dense urban areas, while hillside properties often require creative engineering. Whether it’s restoring a vintage bungalow or upgrading a high-rise condo, Los Angeles remains a fast-paced, trendsetting market where quality craftsmanship and thoughtful design drive success.
From Altadena to Malibu, Kitchen and Bath Los Angeles proudly delivers expert remodeling services to homeowners across Pacific Palisades, Studio City, Laguna Niguel, and beyond.
Enjoy a very helpful breakdown, Checklist, and Timeline for a complete bathroom remodeling:
Planning & Design (1 week)
• Site assessment and measurements
• Finalize design and layout
• Select materials and fixtures (tile, vanity, lighting, etc.)
• Obtain permits (plumbing, electrical, building)
Demolition (2–3 days)
• Turn off water and electricity
• Remove old tile, fixtures, vanity, drywall
• Cap plumbing and safely dispose of debris
Rough-In Work (4–7 days)
• Plumbing: reposition drains, supply lines
• Electrical: new lighting, outlets, GFCI protection
• HVAC: vent fan installation or relocation
• City inspection of rough plumbing and electrical
Framing & Backer Installation (2–3 days)
• Frame for niches, benches, new walls if needed
• Install cement board or moisture-resistant drywall
• Apply waterproofing membrane in wet areas
Tiling (5–7 days)
• Floor and wall tile installation
• Grouting and sealing
• Install shower pan or waterproof base
• Cure time before fixture install
Fixtures & Finishes (3–5 days)
• Install toilet, vanity, sink, faucet, shower trim
• Connect lighting, switches, and exhaust fan
• Paint walls and trim
• Install mirror, towel bars, and accessories.
Final Touches & Walkthrough (1–2 days)
• Seal grout, caulk edges
• Deep clean and polish surfaces
• Final inspection and client walkthrough
Bathroom addition:
A bathroom addition involves more than interior upgrades. it starts with expanding the home’s footprint. This requires architectural planning, zoning approval, and foundation work such as grading, trenching, and pouring concrete. New framing, roofing, and exterior finishes must match the existing structure. Utilities like plumbing lines, electrical circuits, and sewer connections need to be extended or upgraded, sometimes involving the main panel or municipal tie-ins. Proper insulation, waterproofing, and ventilation systems are essential to prevent long-term issues. Once the shell is built and utilities are in place, the interior process mirrors a standard remodel with finishes, fixtures, and final inspections completing the transformation.
Need the money to improve your home?
Financing a home renovation or addition with Kitchen and Bath Los Angeles is more accessible than ever. Flexible options tailored to different budgets and timelines, $0 down, unsecured funding with fixed rates, and cash-out refinancing are ideal for larger projects.
Making upgrades possible without upfront strain!
City Permits and Fees:
In Los Angeles, bathroom remodels and additions must comply with strict city codes and require permits from the Department of Building and Safety. Any work involving plumbing, electrical, or structural changes like moving walls or adding square footage triggers permit requirements and inspections. For additions, a full plan check is necessary, often involving architectural drawings and engineering approval. Fees vary based on project size and estimated value, ranging from a few hundred to several thousand dollars. The city offers online tools to estimate costs, but working with Kitchen and Bath Los Angeles’s experienced, licensed contractor ensures compliance, smoother approvals, and long-term peace of mind.
Become one of our happy clients and enjoy premium service that’s always on schedule and within your budget!